Engineering a Sustainable Future
Engineering a Sustainable Future
The successful delivery of Factory Acceptance Testing (FAT) for the 132kV Low Impedance Busbar and associated CBU units at Leiston.
Full scheme review, review and develop test instruction for validation of protection system settings, development of configuration files, building test platform and validation of complete protection system settings and final customer FAT.
The on time and successful delivery of the project demonstrate REDAS’s capability in Protection & Control testing, high-voltage secondary systems and factory-based acceptance testing.